FREE for Everyone—Levels the Playing Field for the Little Guy to Compete and Lowers Costs for Consumers!

ESCROW.COM Removes the Gamble and Helps Protect Your Investment

Escrow.com: Buy or Sell Online Without the Fear of Fraud
CJ-the Contractor

Scope of Work Template for Home Renovations

Includes FREE Printable "Scope of Work" Worksheet Below

Homeowner and contractor reviewing scope of work
Construction News You Can Use

A clear Scope of Work (SOW) is the #1 tool to prevent confusion, delays, and budget creep. Use this guide and the printable worksheet to lock scope, exclusions, allowances, and expectations—before anyone swings a hammer.

What a Scope of Work Covers

01

Areas & Tasks

List each room/area (e.g., “Hall Bath,” “Kitchen,” “Front Exterior”) and the exact tasks for that area. Keep bullets short. If a task exists in multiple rooms, list it under each room.

02

Specifications

Include brand/model where known. If something is undecided, use an allowance (e.g., “Tile allowance $8/sq ft, 65 sq ft”). Note required finishes, dimensions, and layout choices.

03

Quantities & Measurements

Square footage, linear footage, fixture counts, cabinet runs, appliance sizes—quantities prevent disputes and help price accurately.

04

Explicit Exclusions

Say what’s not included (e.g., “structural changes,” “moving plumbing,” “permits by owner”). Exclusions are as important as inclusions.

05

Site Conditions & Prep

Access method, protection, dumpster/haul away, daily cleanup expectations, and staging area. If condo/HOA rules apply, list them.

06

Finish & Close-Out

Touch-up paint, caulking, hardware alignment, and a documented punch list a few days before substantial completion. Note warranty and response time.

Pro tip: Use bullets, not paragraphs. Bullets get read. Add a one-line summary per room, then the details.

Scope of Work Worksheet

1) Areas & Tasks

Room / AreaTasks (bullets)

2) Specifications

Tile (brand/model) or allowance $/sq ft — est. sq ft
Vanity/Cabinets (brand/line) or allowance
Countertop (material/thickness/edge)
Fixtures (brand/model/finish)
Paint (brand/sheens) — colors due by

3) Quantities

Tile walls: ____ sq ft    Tile floor: ____ sq ft
Countertop: ____ linear ft
Cabinets: ____ linear ft
Lighting: ____ recessed    ____ pendants

4) Exclusions (Not Included)

5) Site Conditions & Logistics

Access (lockbox/garage), work hours
Protection (dust barriers/floor protection)
Debris (haul away / dumpster location)
HOA/Condo rules, elevator access (if any)

6) Allowances & Upgrades

ItemAllowanceSelectedVariance

7) Close-Out

Punch list walk-through date window
Warranty (what/length/response time)

Two Real-World Examples

Example A — Hall Bathroom Remodel (5′×8′)

  • Demo: Remove tub, tile surround, vanity, toilet, floor, mirror, accessories. Cap lines.
  • Plumbing: Install tub-shower valve (Delta/Brizo or equivalent), new drain/overflow; set new toilet.
  • Electrical: GFCI outlet, vanity light box centered, 80 CFM bath fan tied to light switch.
  • Tile: 3 walls around tub to 84″; allowance $8/sq ft wall tile (~65 sq ft). Floor tile allowance $5/sq ft (~40 sq ft).
  • Vanity & Top: 30″ vanity (allowance $450) + quartz top (allowance $450); undermount sink; single-hole faucet.
  • Paint: Walls/ceiling semi-gloss, trim satin; color by {date}.
  • Exclusions: No layout move; no structural changes; no recessed medicine cabinet.

Example B — Kitchen Refresh (No Layout Change)

  • Demo: Remove counters, backsplash, sink, faucet; keep cabinets.
  • Countertops: Quartz 3 cm, eased edge, 48 linear ft; include template & install.
  • Backsplash: Subway tile to 18″ AFG; allowance $7/sq ft (~60 sq ft).
  • Plumbing: Undermount sink (allowance $350) + pull-down faucet (allowance $250).
  • Electrical: Replace outlets/switches with white Decora; under-cabinet LED strip (warm 3000K).
  • Paint: Touch up walls; cabinet paint excluded.
  • Exclusions: Appliance install by others; no cabinet modifications.

Allowances & Tracker (Quick Snippet)

Paste this mini-table into a doc/sheet and track selections vs. budget. Variances get added/subtracted on the next milestone payment.

ItemAllowanceSelectedVarianceNotes
Wall tile$8/sq ft × 65 = $520$9/sq ft × 65 = $585+$65Upgraded finish
Vanity$450$399−$51Sale price
Countertop$2,100$2,150+$50Edge upgrade

Common Mistakes

  • “Install tile” with no square footage or height noted.
  • No exclusions—guaranteed misunderstandings.
  • Missing brand/model or an allowance line.
  • No mention of cleanup, debris, or access limits.
  • Verbal changes—always use a written change order.
Copy-paste email to send your SOW for sign-off

Subject: Scope of Work – Please Review & Confirm

Hi {Contractor Name},

Attached is the one-page Scope of Work for {project/address}. It includes areas & tasks, specs/allowances, exclusions, and site conditions. Please reply “Approved as written” or list any edits in bullets. Once confirmed, we’ll use this SOW for pricing, scheduling, and change orders.

Thanks,
{Homeowner Name} • {Phone}

This guide is general information, not legal advice. Requirements vary by project and location.

5% Coupon Code: ALP5

Most people sugarcoat this industry because construction workers are some of the hardest-working people in America.
AI doesn’t sugarcoat anything.
It lays out the truth—no ego, no emotion, no politics.
Just facts that point you toward growth and opportunities that are challenging to learn when you’re in the field. Learn more…

How many times have you stepped into a country club restroom or upscale dining space and felt that quiet, unmistakable sense of refinement? The air seems softer, the lighting warmer, even the water flows differently. Learn more…

The average homeowner doesn’t realize how exposed they are until something goes wrong. Most projects start with a handshake and a check. There’s Learn more…

Part of Construction Digital Toolbox brought to you by Contractors Junction. This Publication includes a Project Kickoff Checklist. Learn more…

Part of Construction Digital Toolbox brought to you by Contractors Junction. This Publication includes a FREE “Scope of Work” print and save PDF. Learn more…

Part of Construction Digital Toolbox brought to you by Contractors Junction. This Publication includes a FREE print and save “Change Order PDF“. Learn more…

The trap happens when a great operator assumes the same drive and focus that made them efficient in the field will automatically translate to running a company. It rarely does. The job shifts from producing work to managing people and resources, and those who fail to make that shift often end up overworked, underpaid, and burned out.  Learn more…

Sustainability isn’t a passing trend—it’s reshaping how the construction industry operates. Contractors who adapt now will find themselves ahead of the curve as clients, architects, and local governments push for energy-efficient, environmentally responsible projects. Learn more…

The latest federal housing data delivered a mixed message that matters directly to your schedule and cash flow: housing starts ticked up, while building permits slipped. PDF”. Learn more…

You can get more mower for less money if you understand how the market really works. Whether you’re cutting your own quarter acre or Learn more…

Regulators have advanced a national heat illness prevention rule, and regardless of the final text, the expectations are already clear: hydrate crews, plan work/rest, train supervisors, and document what you’re doing. Learn more…

Affiliate Disclaimer: This site uses affiliate links. We may earn a commission when you click.

Copyright 2024-2025 Contractors Junction |

Scroll to Top